Supply and Install a New Connection Pipeline from the Transmission Pipeline Zarqa Carrier 1 (ZCI) to Development Area #22

This project includes the supply, installation, testing, and commissioning of a new connection pipeline branching from the existing Zarqa Carrier 1 (ZCI) transmission pipeline to serve Development Area #22. The works aim to provide a reliable water connection to the development area while ensuring compliance with the approved technical specifications, safety standards, and project requirements.