Project: Supply and Installation of pipes fittings phase and fittings phase wastewater network of Za’atari Camp network.

This project includes the supply and installation of pipe fittings and related components for the wastewater network at Za’atari Camp. The works include fittings, joints, bends, tees, couplings, manholes, chambers, connections, and all necessary accessories required to complete and connect the wastewater network according to approved drawings, technical specifications, and site requirements. The project aims to improve the efficiency, reliability, and operation of the wastewater collection system within the camp.