This project includes the supply and installation of the wastewater network for As-Salt New Hospital. The works include wastewater pipelines, pipe fittings, manholes, chambers, connections, joints, and all related civil and mechanical works required to complete and operate the network according to approved drawings, technical specifications, and site requirements. The project aims to provide an efficient and reliable wastewater collection system to support the hospital’s infrastructure and ensure safe wastewater disposal.